Week 9: Ending 8 September - Ducting, cabling & wiring

Off to Sandy Cove on a delightful Sunday afternoon to check out progress & take a photo or 100.  Someone wasn't too impressed at having to share his car seat with the measuring equipment. 



So with decisions about electrical points, lights, data points and TV antenna points made & reviewed, the electrician and data team laid all the wiring.  Also went in was the air conditioning ducting. 



Ray's workshop

And in the hope of not hitting wires/cables when future Mr Fixit projects happen, Ray & I took photos of everything.  All carefully labelled and measured - something we wish we had done when Orion Street was being renovated. 


Dining area wall...through two bedrooms & bathroom to workshop
 
Kaiser was thoroughly bored by this whole episode.  His beach time at lunchtime, with a full tide, was some compensation. 

However, he does need to learn NOT to swallow so much salt water when swimming & fetching sticks.  To say he christened the concrete slab is an understatement!  But he did have fun with some new friends.